BACKGROUND: Former textile mill, continuous operations from early 1800’s through 1960’s. Past use of the solvent Tetrachloroethylene (PCE) adversely impacted Site groundwater. ‘Daughter’ cVOCs Trichloroethylene (TCE) and cis-1,2-Dichloroethylene (cis-1,2-DCE), documented above Ontario Ministry of Environment (MOE) Table 3 SCS standards.

BASELINE: Source zone [PCE] in groundwater 120,000 micrograms per kilogram (µg/Kg); ‘daughter’ cVOC [TCE] ≈150,000 µg/L, [cis-DCE] > 60,000 µg/L.

RESULTS: ERDenhanced™ In 6-months amended groundwater realized >99% reduction in PCE; >95% reduction in TCE; and, >81% reduction in cis-1,2-DCE, with no rebound and/or detectable concentrations of vinyl chloride (VC).