BACKGROUND: The site, a former suburban dry cleaner, is the end unit of a strip-mall. Obtained through a bankruptcy, Owner wished to remediate subsurface soil/ groundwater conditions to allow redevelopment/re-occupancy. Less than 4-years after a single ERDEnhanced™ deployment event, moles of PCE and total [cVOCs] decreased >99%↓, the site has been redeveloped, occupied and realized a 200% increase in value; while saving the Owner 10-years and over $500,000 in initial remediation costs.
RESULTS: Based on results of a 2011 on-site Proof-of-Concept study, a voluntary biostimulation program was implemented by the Owner in 2014. Using a subslab infiltration gallery, a 12% additive slurry (4,224 pounds additive to equal parts water) was gravity fed to the subsurface, displacing <7% pore space volume within the amending zone. Baseline [PCE] averaged >15,000 ug/L with minimal daughter products present. 18-months after deployment, concentrations PCE and all daughter products decreased >99% within the amending plume and ≈45ft downgradient the amending gallery; with average reductions in the plume: >96% (PCE), >88% (TCE), >94% (cis-DCE), and 92% (VC).
Download full case study here.