<p><span style=”color: #0976bc;”><strong>PROCEDURES: </strong></span>Treatment area approximately 80x80ft (6,400 ft2) with estimated 5-foot vertical impact. 26 injection nodes, constructed of 2-inch OD PVC, previously installed using 10-foot centers within the treatment area. Using existing infrastructure, groundwater was amended with <strong><span style=”color: #0976bc;”>TPH</span>Enhanced™</strong> using Passive Release Sock (PRS) deployment units at each node. PRS units are 5-ft long, contains ≈2-pounds of additive, and were deployed twice during 9-month evaluation, March 2017 then May 2017. Two monitoring wells, MW-7 within the treatment area and MW-4 downgradient the treatment area, were periodically monitored/sampled to evaluate product efficacy. Post <strong><span style=”color: #0976bc;”>TPH</span>Enhanced™</strong> deployment observations included solubilization of residual mass and destruction of newly bioavailable dissolved contaminant:.</p>
<p><span style=”color: #0976bc;”><strong>RESULTS:</strong></span> From peak bioavailability, the following reductions were observed at MW-4:</p>
<ul>
<li>98% decrease in Benzene after &gt;1,000% increase</li>
<li>83% decrease in Ethylbenzene, after initial 768% increase, and</li>
<li>97% decrease in Xylenes after initial 2,500%+ increase<br />Toluene was BDL throughout the evaluation</li>
</ul>
<p>Download full case study <a href=”https://terrastryke.com/wp-content/uploads/2020/01/TPHenhanced-Upstream-Legacy-Oil-Gas-Facility-Case-Study-November-5-2019.pdf”>here</a>.</p>